Chain Bridge

The first permanent bridge between Buda and Pest, with stone lions at each end.

The Chain Bridge was the first permanent crossing of the Danube between Buda and Pest, opened in 1849. Before it the river was crossed by boat or, in winter, on the ice — and sometimes not at all.

Our partner

Travel insurance · 5% off for our readers

Get a quote
Tickets and things to do nearby through Booking.com

Count István Széchenyi drove the project, reportedly after being unable to cross for days when his father died; the story is widely repeated and is part of how Hungary tells it.

It was designed by the English engineer William Tierney Clark and built under the supervision of the Scottish engineer Adam Clark, who were not related.

Stone lions were added at each end a few years later. A persistent story says the sculptor drowned himself because they had no tongues; they do have tongues, and he did not.

The bridge was blown up by retreating German forces in 1945 and rebuilt to the original design.

It was closed for a long restoration and reopened in 2023.

Where it is

Chain Bridge on the map